~ Fireflies
 ~ Water Facts
 ~ Photo Library
 ~ Environmental Management
 ~ Local Communities
 ~ Integrated Water Resources Management
 ~ News Room
 ~ Challenges of SSP3 Construction
 
     
   


REALIGNMENT OF THE KKB-BUKIT FRASER ROAD (FEDERAL ROUTE 55)

Aerial view of the realignment of KKB - Bukit Fraser Road

About 7.7km of the original KKB-Bukit Fraser Road was realigned and shifted to a higher elevation. This is necessary as the original road is inundated by the Sungai Selangor Dam. The realigned road now comes with two new bridges, the Sg. Luit Bridge and the Sg. Selangor Bridge and rest areas. The new stretch of road skirts around the dam with a panoramic view of the entire dam and a backdrop of lush greenery.



Top of the page


<< Previous | Next >>